Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | China, Jiangsu |
---|---|
Brand Name: | Shenghong |
Certification: | CE ISO |
Model Number: | SH16-06-05-08 |
Minimum Order Quantity: | 1 sets |
Price: | Negotiation |
Packaging Details: | Container |
Delivery Time: | 40 days after payment |
Payment Terms: | T/T |
Supply Ability: | 30 SETS/ MONTH |
Type: | Tile Forming Machine | Tile Type: | Steel |
---|---|---|---|
Use: | Roof | Production Capacity: | 15-18m/min |
Power(W): | 22kw | Voltage: | 380v/50hz/3phase |
High Light: | cold forming machine,cold rolling equipment |
Uncoiler | 1 set |
Guiding Equipment | 1 set |
Roll Forming Equipment | 1 set |
Post Cut Equipment | 1 set |
Hydraulic Station | 1 pc |
PLC Control | 1 pc |
Supporter Table | 2 pc |
Suitable raw material | Color steel sheet; Galvanized steel sheet |
Thickness of the material | 0.8m to 1.2mm |
Yield strength of material | 235Mpa |
Uncoiler' s loading capacity | Max. Capacity: 5000Kgs. (can be increased to be 10 tons) |
Forming speed | About 15-20m/min |
Main motor power | 18Kw(Depend on final design) |
Hydraulic station power | 5.2Kw(Depend on final design) |
Controling System | Mitsubishi PLC & converter |
Votage | 380V, 3 phase 60Hz or according to at buyer' s requirment |
Quantity of the roller group | At lest 15 groups(depend on final design) |
Machine dimension | About 18m*1.5m*1.4m(depend on final design) |
Total weight | About 10000kgs(depend on final design) |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)